{"id":499,"date":"2024-06-18T09:58:30","date_gmt":"2024-06-18T09:58:30","guid":{"rendered":"https:\/\/aiguaneix.cacbgi.cat\/the-foundation-stone-has-been-laid-for-the-water-treatment-plant-that-will-ensure-the-supply-and-quality-of-water-in-lescala\/"},"modified":"2024-09-27T08:16:45","modified_gmt":"2024-09-27T08:16:45","slug":"the-foundation-stone-has-been-laid-for-the-water-treatment-plant-that-will-ensure-the-supply-and-quality-of-water-in-lescala","status":"publish","type":"post","link":"https:\/\/aiguaneix.cacbgi.cat\/en\/the-foundation-stone-has-been-laid-for-the-water-treatment-plant-that-will-ensure-the-supply-and-quality-of-water-in-lescala\/","title":{"rendered":"The foundation stone has been laid for the water treatment plant that will ensure the supply and quality of water in L\u2019Escala"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">In July, Miquel Noguer, President of Girona Provincial Council and of the Costa Brava Girona Water Consortium; Josep Bofill, Mayor of L&#8217;Escala; and Anna Torrent\u00e0, the Delegate of the Government of Catalonia for Girona, laid the foundation stone for the future potable water treatment plant (PWTP) in L&#8217;Escala.<\/p>\n\n<p class=\"wp-block-paragraph\">The facility will be located on a 5,851 m\u00b2 plot of land in Mas Mart\u00ed, is set to be completed by the summer of 2025, and will have a capacity of 14,000 m\u00b3 per day. The Costa Brava Girona Water Consortium will fund most of the \u20ac7,206,897.79 project cost, with additional funding from the Catalan Water Agency (ACA). <\/p>\n\n<p class=\"wp-block-paragraph\">Noguer highlighted that this is &#8220;the second most significant investment by the Consortium in water supply over the past twenty years\u201d.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In July, Miquel Noguer, President of Girona Provincial Council and of the Costa Brava Girona Water Consortium; Josep Bofill, Mayor [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":476,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[5],"tags":[],"class_list":["post-499","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/aiguaneix.cacbgi.cat\/en\/wp-json\/wp\/v2\/posts\/499","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aiguaneix.cacbgi.cat\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aiguaneix.cacbgi.cat\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aiguaneix.cacbgi.cat\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/aiguaneix.cacbgi.cat\/en\/wp-json\/wp\/v2\/comments?post=499"}],"version-history":[{"count":1,"href":"https:\/\/aiguaneix.cacbgi.cat\/en\/wp-json\/wp\/v2\/posts\/499\/revisions"}],"predecessor-version":[{"id":500,"href":"https:\/\/aiguaneix.cacbgi.cat\/en\/wp-json\/wp\/v2\/posts\/499\/revisions\/500"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aiguaneix.cacbgi.cat\/en\/wp-json\/wp\/v2\/media\/476"}],"wp:attachment":[{"href":"https:\/\/aiguaneix.cacbgi.cat\/en\/wp-json\/wp\/v2\/media?parent=499"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aiguaneix.cacbgi.cat\/en\/wp-json\/wp\/v2\/categories?post=499"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aiguaneix.cacbgi.cat\/en\/wp-json\/wp\/v2\/tags?post=499"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}